Specialized Vertical — Manufacturing, BOM & Costing

Real-Time Production Costing & Live Material Reservation in Xtra Desktop 2027

From multi-level Bills of Materials (BOM) and multi-stage production orders to Live Raw-Material Reservation, overhead allocation, deviation analysis, 6 costing methods (incl. FIFO), and direct ZKTeco factory biometric payroll.

Download Xtra Desktop 2027
Live BOM Reservation & Cost Calculator Live Reservation
250 Units
Live Reserved Raw Stock
450 kg
Net Available for Sale
2050 kg
Allocated Overhead
$212.50
Total Standard Cost
$3,312.50
Industrial Precision Meets Accounting

Built-In Manufacturing Capabilities in Xtra Desktop 2027

Multi-Level BOM & Production Stages

Define standard manufacturing models, execute multi-stage production orders, and monitor actual material consumption.

Live Reservation & Deviation Reports

Automatically deduct active production reservations in inventory reports and compare standard vs. actual deviations.

Overhead Allocation & 6 Costing Methods

Distribute indirect factory expenses accurately across outputs using Weighted Average, FIFO, Last Cost, or Standard Costs.

Weight + Piece Hybrid Inventory

Rare dual tracking by kilograms and barcoded pieces simultaneously, ready for modern Android sorting floor companions.

HR, Shifts & Direct ZKTeco Biometrics

Pull live attendance directly from ZKTeco fingerprint scanners to automate factory shifts, overtime, payroll, and end-of-service.

Fixed Assets & Machine Depreciation

Track machinery lifecycle, additions, disposals, and automated periodic depreciation entries linked to cost centers.